Planning workspace

Sprint Capacity

Input section

Team

Start with the team shape and the baseline sprint window.

Input section

Time

Define the raw sprint envelope before availability adjustments kick in.

Ceremonies, planning, reviews, and standing syncs.

Used to convert hours into a rough story point envelope.

Input section

Availability

Reflect the team’s real availability instead of idealized best-case throughput.

Time off mode

Focus factor

75%

A realistic team often lands between 65% and 80% once actual maker time is considered.

Input section

Adjustments

Buffers and drag factors that make the model more realistic.

Optional. Used as an empirical ceiling for planning advice.

Lets the tool compare the intended sprint scope against the safer planning band.

Results

Usable sprint capacity

Usable sprint capacity after time off, ceremonies, focus reality, and adjustment buffers.

255h

25 point planning target
Per person42.4h
Recommended plan204h
Capacity-based estimate32 pts
Capacity breakdown

Where the sprint time goes

A stacked breakdown of the full sprint envelope, from total hours down to usable delivery capacity.

Time off

24.0h

Meetings

66.0h

Focus drag

38.0h

Usable capacity

254.5h

Safe vs risk

Planning guardrails

Compare usable capacity, the safer 80% planning band, and the actual commitment.

Usable capacity

255h

Recommended plan

204h

Planned load

224h

Green zone = safer planning bandAmber marker = stretch edgeStrong bar = your actual planned load

Stretching

Sprint Capacity Calculator | StoryPointLab